Skip to content
Knowledge / Data

Hub

Data

What does the estate state, as data?

What DPP obligations apply, and when?

Three product categories have an adopted Digital Product Passport duty with a date on it. Batteries from 18 February 2027, detergents and surfactants from 23 September 2029 and toys from 1 August 2030. Everything else is either a measure an institution plans, or an obligation that is real and is not a passport: the unsold apparel and footwear destruction ban from 19 July 2026, PPWR from 12 August 2026, national right to repair measures from 31 July 2026, environmental claims rules from 27 September 2026 and EUDR from 30 December 2026.

Thirty-two rows, from two places and nowhere else. The DPP timeline is the category-by-category view with its own closed vocabulary of date types. The action radar is the instrument-by-instrument view with a status and a business action. Both are maintained pages carrying verification dates, and a row here that is not on one of them is a bug rather than an addition.

Status is normalised to four words so a machine can filter without reading prose. Adopted means a duty exists in law from that date. Planned means an institution has committed to a measure. Indicative means an official planning date that can move. Proposed means a text still in procedure. The page's own phrasing travels alongside, because the short word is a filter and the sentence is the meaning.

Eight rows carry a CELEX, which is every row whose source names an instrument number. JSON and CSV sit beside the table.

Every dated obligation the estate states

32 rows, from the DPP timeline and the action radar. JSON and CSV.

DateCategoryInstrument or eventCELEXStatusStated on
17 August 2023batteriesRegulation (EU) 2023/1542 entered into force32023R1542adoptedtimeline
18 July 2024ESPRRegulation (EU) 2024/1781 entered into force32024R1781adoptedtimeline
24 Nov 2025CRMA permanent-magnet labelling/data carrierArticle 28 creates future label/carrier duties; the corrected deadline for the implementing act has passed, but the application clock runs from that act's entry into forceplannedpermanent-magnets
8 January 2026construction-productsRegulation (EU) 2024/3110 generally began to apply32024R3110adoptedtimeline
22 March 2026detergentsRegulation (EU) 2026/405 entered into force32026R0405adoptedtimeline
13 May 2026textilesJRC supporting study on textile DPP publishedplannedtimeline
15 July 2026DPP systemCommission Implementing Decision (EU) 2026/1736 referenced six harmonised DPP standards32026D1736adoptedtimeline
19 Jul 2026ESPR unsold apparel/footwear destruction prohibitionDestruction is prohibited for the covered scope; recycling counts as destruction under the ESPR definitionadopteddestroying-unsold-stock
20 July 2026DPP systemEU DPP Registry became operationaladoptedtimeline
31 Jul 2026Right to Repair DirectiveEU deadline passed; product scope is Annex II based and national implementation variesadoptedright-to-repair
12 Aug 2026PPWRPPWR now applies; Article 12 creates future harmonised labels/digital-carrier rules and a single-carrier rule where product law also uses a carrieradoptedpackaging-ppwr
18 August 2026batteriesStatutory date in Article 77(9) for detailed legitimate-interest access rulesadoptedtimeline
September 2026DPP systemCommission roadmap indicates decision on the remaining two DPP standardsindicativetimeline
3 Sep 2026Green Claims Directive proposalEUR-Lex procedure 2023/0085/COD remains marked ongoingproposedgreen-claims-directive
27 Sep 2026Environmental claims under Directive (EU) 2024/825Binding consumer-law changes move into application through national law32024L0825adoptedeu-environmental-claims-27-september-2026
Q4 2026batteriesCommission roadmap indicates Battery access-rights implementing actindicativetimeline
Q4 2026iron-steelCommission plans ESPR delegated actindicativetimeline
30 Dec 2026EUDRDue diligence, geolocation and evidence must be ready for in-scope productsadoptedeudr
18 February 2027batteriesBattery Passport becomes mandatory for covered LMT, EV and industrial batteries above 2 kWhadoptedtimeline
Q2 2027construction-productsCommission roadmap indicates construction DPP delegated actindicativetimeline
Q2–Q3 2027DPP systemCommission roadmap indicates service-provider delegated actionindicativetimeline
17 Jun 2027Textile EPREU framework now fixes national producer registers, PROs and core producer-cost principlesadoptedtextile-epr
30 Jun 2027EUDRDue diligence, geolocation and evidence must be ready for in-scope productsadoptedeudr
Q3–Q4 2027aluminiumCommission roadmap / Working Plan trackindicativetimeline
Q3–Q4 2027tyresCommission roadmap / Working Plan trackindicativetimeline
End 2027footwearWorking Plan indicates study milestoneplannedtimeline
Q4 2027textilesCommission plans textile ESPR delegated actindicativetimeline
2028FurnitureWorking Plan trackindicativetimeline
17 Apr 2028Textile EPREU framework now fixes national producer registers, PROs and core producer-cost principlesadoptedtextile-epr
2029MattressesWorking Plan trackindicativetimeline
23 September 2029detergentsRegulation (EU) 2026/405 generally applies32026R0405adoptedtimeline
1 August 2030toysRegulation (EU) 2025/2509 applies32025R2509adoptedtimeline